City Information

Storm Water

  • Cache Valley Storm Water Design Standard

    Storm Water Standards adopted by Hyde Park City February 2018

  • SWPPP Document

    This form is to be completed with all building permits or developments.

  • Storm Water Ordinance

    Approved August 10, 2016

  • Stormwater Management Plan

    Updated June 2016

  • ***STORMWATER HOTLINE***

    ** NOTICE ** To report illicit discharges into a storm drain, such as litter, oil, etc., please contact Kolby at the Storm Water Hotline or (435) 535-5021.

  • SWPPP Permit Cover Sheet

    This permit must be completed with all developments over 1 acre. A State NOI is also required. A $300 stormwater inspection fee will be charged with the building permit. This form is fillable.

  • SWPPP (under one acre) Cover Sheet

    All building permits which are a part of a development must submit a SWPPP along with the building permit. A $300 stormwater inspection fee will be charged with the building permit. This form may be filled out online.

  • Household Hazardous Waste

    General Information on the Household Hazardous Waste Facility opertated by Logan City at 200 North 1400 West Logan, UT 435.713.6686

  • Contractor SOP

    Standard Operating Procedures

  • BMP's

    Sample of acceptable BMP's for Common Plan of Development (Projects under 1 acre.)

  • MS4 Permit Information
  • Pollution Prevention Tips

    Pollution prevention begins at home. Incorporate some of these tips into your daily routine. You may find they not only save energy, reduce waste, and preserve our natural resources- they may also save you money.

  • Stormwater

    Explaination of the need for a Stormwater Fee